I’m working on a Management question and need guidance to help me study.
hi, I need to create a WBS for the interior design of the project. Details of the project work are in the document. Please hand it in as excel format.
there are 6 parts in the project:
1- government licence, drawings and survey
2- construction
3 – interior design (from Sep. 1st 2020 to Oct.1st 2020)
4- interior decoration
5- IT
6- Maintenance and closure
I am only doing the WBS on the 3rd part(interior design)